Flyprat


Go Back   Flyprat > Flyforum
Register Cookies FAQ Community Calendar Today's Posts Search

Notices

Reply
 
Thread Tools Display Modes
Old 17-03-2009, 19:53   #1
Blubird
ScanFlyer Mile High Club
 
Join Date: Sep 2004
Location: På bakken
Posts: 8,252
Boeing Ytterligere 787 forsinkelser

Ser ut til at vi inntil videre kan glede oss til juni:


Quote:
Boeing remains focused on beginning flight testing of its 787 in June.

Quote:
Noting that there is a 787 Lego set now on the market, noted industry analyst Adam Pilarski yesterday quipped: "Even a ten year old can do it (put the Lego set together) so please get your stuff together."

Boeing sticks to 787 flight test timeline
Blubird is offline   Reply With Quote
Old 17-03-2009, 20:16   #2
LN-AFG
ScanFlyer Gold
 
LN-AFG's Avatar
 
Join Date: Oct 2004
Location: ENBR/BGO
Posts: 1,882
Default Re: Mot B787 First Flight som planlagt

Boeing har brutt så mange løfter om tidsaspektet ved 787 at jeg først tror det når kjerra flyr. At de holder på det meget tidstøffe sertifiseringsprogrammet kan ende i tårer, hvis noe går galt. Med så mye ny teknologi som skal sertifiseres er jeg tvilende til at alt går helt etter planen nå.
__________________
Upcoming Flights:
LN-AFG is offline   Reply With Quote
Old 23-04-2009, 14:40   #3
Discus
ScanFlyer Inventory

Galley Slave
Global Moderator
 
Discus's Avatar
 
Join Date: Apr 2008
Posts: 26,690
Default Re: Mot B787 First Flight som planlagt

Drar denne tråden opp igjen:

Det er full fart med 787-prosjektet på Everett om dagen, så får vi se om farten holder til mål:

Quote:
Boeing 787 programme tempo accelerates towards first flight target

Boeing has accelerated the pace of the 787 programme as it targets a first flight by the end of June. Key milestones required for the maiden sortie have been completed, but questions remain about the production ramp-up effort.

The airframer completed the factory gauntlet on 20 April, the first of three closed-loop simulations tests, marking the hand-off of 787 prototype "ZA001" to the flight-test team. Programme sources indicate that the factory "gauntlet test" was accomplished faster than anticipated.
http://www.flightglobal.com/articles...st-flight.html
__________________

________________________________________
An airport runway is the most important Main Street in any town. (Norman Crabtree, Former Director, Ohio Department of Transportation)
Discus is online now   Reply With Quote
Old 23-04-2009, 23:02   #4
LN-MOW
Flyklapper
 
LN-MOW's Avatar
 
Join Date: Sep 2004
Location: KGRD
Posts: 58,374
Default Re: Mot B787 First Flight som planlagt

Ikke lenge før den kommer på rullebanen for taxitester ... med front row seats fra Boeings tursenter.

Quote:
Within the next week, one of the huge doors at the Everett plant will open and the first of the new 787 Dreamliners will roll out onto the flight line by the Paine Field runway.
http://seattletimes.nwsource.com/htm...amliner23.html
__________________
Andreas Mowinckel
enfb.net
Airliners at Fornebu
Radar Station KGRV3
LN-MOW is offline   Reply With Quote
Old 23-04-2009, 23:09   #5
Martin
ScanFlyer Mile High Club

Global Moderator
 
Martin's Avatar
 
Join Date: Sep 2004
Location: Til høyre for OSL
Posts: 13,638
Default Re: Mot B787 First Flight som planlagt

Jeg krysser fingrene for at det ikke skjer noe med høyre nesehjulsdør

Last edited by Martin; 24-04-2009 at 16:00.
Martin is offline   Reply With Quote
Old 24-04-2009, 15:41   #6
hurvert
ScanFlyer Silver
 
hurvert's Avatar
 
Join Date: Oct 2007
Posts: 888
Default Re: Mot B787 First Flight som planlagt

Quote:
Originally Posted by Martin View Post
Jeg krysser finngrene for at det ikke skjer noe med høyre nesehjulsdør
Den du sjekket om tålte belastning Martin ?
__________________
LA2TUA

hurvert is offline   Reply With Quote
Old 24-04-2009, 15:47   #7
gardkarlsen
ScanFlyer Silver
 
gardkarlsen's Avatar
 
Join Date: Oct 2007
Location: Stavanger
Posts: 579
Default Re: Mot B787 First Flight som planlagt

Hvem er første kunde som får 787?
__________________
Mvh<br>Gard<br>gardkarlsen.com - reisebrev og bilder<br>
<br><b>Upcoming flights:</b><br>
gardkarlsen is offline   Reply With Quote
Old 24-04-2009, 15:56   #8
LN-MOW
Flyklapper
 
LN-MOW's Avatar
 
Join Date: Sep 2004
Location: KGRD
Posts: 58,374
Default Re: Mot B787 First Flight som planlagt

Det er vel fortsatt ANA, tror jeg.


Quote:
Originally Posted by Martin View Post
Jeg krysser finngrene for at det ikke skjer noe med høyre nesehjulsdør
Eller venstre .....
__________________
Andreas Mowinckel
enfb.net
Airliners at Fornebu
Radar Station KGRV3
LN-MOW is offline   Reply With Quote
Old 30-04-2009, 14:52   #9
LN-MOW
Flyklapper
 
LN-MOW's Avatar
 
Join Date: Sep 2004
Location: KGRD
Posts: 58,374
Default Re: Mot B787 First Flight som planlagt

Det ble holdt en større pressebriefing i går .. interessant lesning.

http://blog.seattlepi.com/aerospace/archives/167597.asp

Quote:
About 50 journalists, including photographers and cameramen, are gathering here at Boeing's Bomarc building, and more are expected to listen via conference call. Several journalists are from outside of the U.S.

The company will go over what certification and flight test is all about. Boeing is not expected to announce anything new -- but considering that the last time Boeing flew a new airplane was in 1994, the details about flight test will be new to many people. (Including me.)

First flight of the 787 has been delayed by nearly two years and is expected to occur by the end of June. About 50 percent of the plane is made of composite materials, rather than aluminum -- marking a first for the commercial aviation industry.
__________________
Andreas Mowinckel
enfb.net
Airliners at Fornebu
Radar Station KGRV3
LN-MOW is offline   Reply With Quote
Old 05-05-2009, 02:56   #10
LN-MOW
Flyklapper
 
LN-MOW's Avatar
 
Join Date: Sep 2004
Location: KGRD
Posts: 58,374
Default Re: Mot B787 First Flight som planlagt

Og media har vært på en større sightseeing .. fotoreportasje her:
http://www.seattlepi.com/photos/popu...date=4/30/2009

Og Dreamliner 1 er nå på Flightline.
http://blog.seattlepi.com/aerospace/archives/167941.asp



Matt Cawby har også knipset den:
http://paineairport.com/kpae1998.htm

.
__________________
Andreas Mowinckel
enfb.net
Airliners at Fornebu
Radar Station KGRV3

Last edited by LN-MOW; 05-05-2009 at 02:58.
LN-MOW is offline   Reply With Quote
Old 05-05-2009, 04:05   #11
Superhai
ScanFlyer Rusty
 
Superhai's Avatar
 
Join Date: Sep 2004
Posts: 5,483
Default Re: Mot B787 First Flight som planlagt

Quote:
Originally Posted by LN-MOW View Post
Matt Cawby har også knipset den:
http://paineairport.com/kpae1998.htm
Stilig å se den ved siden av 777 som ser litt gammeldags ut, men det skyldes vel også i stor grad KLM sin livery.
__________________
“I always wonder why birds stay in the same place when they can fly anywhere on earth. Then I ask myself the same question.”
Superhai is offline   Reply With Quote
Old 05-05-2009, 08:09   #12
EB
ScanFlyer Inventory
 
EB's Avatar
 
Join Date: Sep 2004
Location: Ris, Oslo
Posts: 25,293
Default Re: Mot B787 First Flight som planlagt

Men den ble da veldig liten ved siden av 777`n...
EB is offline   Reply With Quote
Old 05-05-2009, 16:56   #13
LN-MOW
Flyklapper
 
LN-MOW's Avatar
 
Join Date: Sep 2004
Location: KGRD
Posts: 58,374
Default Re: Mot B787 First Flight som planlagt

Litt om hva testmaskinene skal igjennom:

http://blog.seattlepi.com/video/bcpl...id=22050374001
__________________
Andreas Mowinckel
enfb.net
Airliners at Fornebu
Radar Station KGRV3
LN-MOW is offline   Reply With Quote
Old 09-05-2009, 00:32   #14
LN-AFG
ScanFlyer Gold
 
LN-AFG's Avatar
 
Join Date: Oct 2004
Location: ENBR/BGO
Posts: 1,882
Default Re: Mot B787 First Flight som planlagt

Kan gå mot ytterligere 6mnd forsinkelse for B787.

Det er New York baserte Bernstein Research som kommer med disse påstandene etter en detaljert gjennomgang av B787 prosjektet for sjette gang.

Les mer her:
Bernstein Research sees further 787 delays, bigger range shortfall
__________________
Upcoming Flights:
LN-AFG is offline   Reply With Quote
Old 09-05-2009, 13:22   #15
Dag Johnsen
ScanFlyer Gold
 
Dag Johnsen's Avatar
 
Join Date: Sep 2004
Location: Wheaton, IL
Posts: 1,557
Default Re: Mot B787 First Flight som planlagt

Heisann LN-AFG!

Quote:
Det er New York baserte Bernstein Research som kommer med disse påstandene etter en detaljert gjennomgang av B787 prosjektet for sjette gang.
Dette er gamle nyheter allerede og Boeing, riktig eller galt, benekter denne analysen...

Dag
__________________
Mel Brooks: If God wanted us to fly, he would have given us tickets!
Dag Johnsen is offline   Reply With Quote
Old 09-05-2009, 13:38   #16
LN-KGL
ScanFlyer Mile High Club
 
LN-KGL's Avatar
 
Join Date: Sep 2004
Location: Oslo, Kiev og Dnipro
Posts: 8,547
Default Re: Mot B787 First Flight som planlagt

Hvordan er Sanford C. Bernsteins track record når det gjelder 787, har han riktig i sine tidligere kommentarerer?
__________________
Kurt
Vi flyr LOT
LN-KGL is offline   Reply With Quote
Old 09-05-2009, 13:41   #17
Dag Johnsen
ScanFlyer Gold
 
Dag Johnsen's Avatar
 
Join Date: Sep 2004
Location: Wheaton, IL
Posts: 1,557
Default Re: Mot B787 First Flight som planlagt

Heisann KGL!

Quote:
Sanford C. Bernsteins track record når det gjelder 787, har han riktig i sine tidligere kommentarerer?
Joda, han og 1000 andre...

Dag
__________________
Mel Brooks: If God wanted us to fly, he would have given us tickets!
Dag Johnsen is offline   Reply With Quote
Old 09-05-2009, 13:55   #18
Dag Johnsen
ScanFlyer Gold
 
Dag Johnsen's Avatar
 
Join Date: Sep 2004
Location: Wheaton, IL
Posts: 1,557
Default Re: Mot B787 First Flight som planlagt

Hei igjen!

LN-AFG, naar du legger inn denne artikkelen fra Bernstein, hvorfor ogsaa ikke legge inn artikkelen fra Boeing?
Quote:
Boeing expressed confidence that the 787 will be certified on time for delivery to ANA in the first quarter of next year despite a pessimistic research report released last week.
Les mer her:

http://www.atwonline.com/news/story.html?storyID=16514

Dag
__________________
Mel Brooks: If God wanted us to fly, he would have given us tickets!
Dag Johnsen is offline   Reply With Quote
Old 09-05-2009, 15:34   #19
Egenes
ScanFlyer Gold
 
Join Date: Mar 2009
Location: I nærheten av Stavanger
Posts: 1,755
Default Re: Mot B787 First Flight som planlagt

Og LEGO settet? Selvfølgelig må jo søskenbarna mine krøkes tidlig hvis de skal lære noe!
Egenes is offline   Reply With Quote
Old 09-05-2009, 20:11   #20
LN-AFG
ScanFlyer Gold
 
LN-AFG's Avatar
 
Join Date: Oct 2004
Location: ENBR/BGO
Posts: 1,882
Default Re: Mot B787 First Flight som planlagt

Dag, fordi jeg ikke stoler på Boeing lenger. Deres track record fra tidligere programmer om å "under promise and over deliver" har så langt ikke stemt med 787 prosjektet.

Jeg er sikker på at det er ett meget bra produkt, men så mye har gått galt at jeg ikke tror de klarer det meget stramme tidsskjema de har satt seg for å teste og sertifisere 787.

Vi får se hvem som får rett, jeg tror mer på pessimistene som analyserer prosjektet enn det Boeing sier.
__________________
Upcoming Flights:
LN-AFG is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Norwegian bestiller ytterligere 2 stykk 787-9 Cockpitview Flyforum 3 22-03-2016 15:28
Tornadoer gir forsinkelser for 737 og 787-linja LN-MOW Flyforum 3 17-04-2012 08:26
Boeing 787 kan stå foran ytterligere forsinkelser Trety Flyforum 110 30-06-2011 07:46
Boeing 787-822 eller 787-224 Dreamliner? SE-SAM Samlerhjørnet 4 08-01-2011 14:57


All times are GMT +2. The time now is 19:45.


Feedback Buttons provided by Advanced Post Thanks / Like (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
Copyright Foreningen Flyprat, Scanair og bidragsytere. Enkelte ikoner fra Famfamfam CC-BY.