Flyprat


Go Back   Flyprat > Flyforum
Register Cookies FAQ Community Calendar Today's Posts Search

Notices

Reply
 
Thread Tools Display Modes
Old 11-01-2005, 22:31   #1
LN-OSS
ScanFlyer Silver
 
Join Date: Oct 2004
Posts: 588
Default Første del av kroppen på 787 ferri



SEATTLE, Jan. 11, 2005 -- Boeing recently completed the first full-scale composite one-piece fuselage section for its new 7E7 Dreamliner program, demonstrating concepts for 7E7 production that begins next year.

The structure, 22-feet (7-meters) long and nearly 19-feet (6-meters) wide, is the 7E7's first major development piece.

"This is a piece of aviation history," said Walt Gillette, Boeing vice president of Engineering, Manufacturing and Partner Alignment. "Nothing like this is already in production. Hundreds of aerospace experts from Boeing and our partners developed everything, including the design, tools that served as the mold, programming for the composite lay-down, and tools that moved the structure into the autoclave. "

He added that using composites "allowed us to create optimized structural designs and develop an efficient production process. We now see how all advanced airplanes will be built from this time forward."

The barrel section was built last month, after several months of development work. Building the piece, which includes stringers, started with computerized lay-down of composite tape on a huge mold. That mold was mounted on a tool that rotated the barrel as the tape was applied. The structure was then wrapped and placed in Boeing's autoclave for curing. The final step was unwrapping, inspection and tool removal.

The team subsequently cut out windows and doors, and tested a painting process. It also ran numerous tests to verify structural integrity.

Gillette added that "everyone will see benefits of this technology -- Boeing and our partners, our customers and the flying public. By integrating this into a single composite structure, we reduced the number of parts in this section significantly and reduced the weight by almost 20 percent. That will mean lower costs for the airlines while for passengers it enables us to have bigger windows, lower cabin altitude pressurization, and higher cabin humidity."

The team will build seven more development pieces, representing different sections of the airplane, throughout 2005.


Info BOEING
__________________
Stian Svensen
My pics at Airliners.net
My pics at Jetphotos.net
LN-OSS is offline   Reply With Quote
Old 11-01-2005, 22:34   #2
Blubird
ScanFlyer Mile High Club
 
Join Date: Sep 2004
Location: På bakken
Posts: 8,274
Default Re: Første del av kroppen på 787 ferri

Tuben ser unektelig veldig liten ut på det bildet...eller er det vinduene som er blitt større enn vanlig?
Blubird is offline   Reply With Quote
Old 11-01-2005, 22:36   #3
Pooh
ScanFlyer Blue
 
Pooh's Avatar
 
Join Date: Nov 2004
Posts: 73
Default Re: Første del av kroppen på 787 ferri

Vinduene er blitt større enn vanlig.
Pooh is offline   Reply With Quote
Old 11-01-2005, 22:51   #4
Superhai
ScanFlyer Rusty
 
Superhai's Avatar
 
Join Date: Sep 2004
Posts: 5,483
Default Re: Første del av kroppen på 787 ferri

Ser ut som en 380-motor.

__________________
“I always wonder why birds stay in the same place when they can fly anywhere on earth. Then I ask myself the same question.”
Superhai is offline   Reply With Quote
Old 12-01-2005, 06:41   #5
EB
ScanFlyer Inventory
 
EB's Avatar
 
Join Date: Sep 2004
Location: Ris, Oslo
Posts: 25,375
Default Re: Første del av kroppen på 787 ferri

Endelig blir det større vinduer igjen...slik som DC-10`ern hadde!!!
EB is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Video 787 Dreamliner siste del fra OSL PerJohan Bilder & foto 18 09-05-2012 09:28
Første Icelandair landet Værnes del 2 adressa Bilder & foto 4 18-04-2010 23:04
Mitt første digitalkamera - del 2 LN-MOW Bilder & foto 7 15-12-2009 17:03
A350 første del er nå produsert! Bilde LN-AFG Flyforum 1 04-12-2009 21:18
Første nese del på 787 er klar !! LN-OSS Flyforum 6 27-08-2005 06:08


All times are GMT +2. The time now is 18:04.


Feedback Buttons provided by Advanced Post Thanks / Like (Lite) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
Copyright Foreningen Flyprat, Scanair og bidragsytere. Enkelte ikoner fra Famfamfam CC-BY.